Starting Disassembly

Last night, I decided the garage was clean enough to get started. Up went the bike on the Costco lift. Off came the seat, tank, carb, plug wires, coil, carb, intake manifold, exhaust. So far, so good. This morning, went to the dump with two garbage cans of junk. Uh, that was the stuff I cleaned up in the garage not the parts off the bike.

Talked with Brian Nallin again today. He's going to supply the 88" kit and is going to refresh my heads as well as put the aforementioned Timeserts in. This time around I'm replacing the lifters with Jims Hydrosolids which require adjustable pushrods. Since Brian is going to bore the cases for me, I'm having him install a windage tray.

I just took the heads off the bike and packaged them up. Ground shipped them to Nallin. Should be there on Monday.